A split order for laser-cut EVA foam parts usually starts with a reasonable request: half the quantity now, half in six weeks, so that a promotion or a retail reset lands on time. The question that decides whether that plan survives is not whether the factory can cut the second batch later. It is whether the setup behind the first batch — tooling, nesting, material lot and print plate — still exists when the second batch runs. Below is what experienced buyers confirm with their EVA foam products manufacturer before they split a quantity, and what they put in writing.
At Fulikai, parts made to customer drawings or samples are produced by two cutting routes: stamping with a steel die and laser-cutting. A stamped part carries its shape in a physical die, so repeat runs reproduce the same outline as long as the die is kept. A laser-cut part carries its shape in a digital cutting file and in how that file is arranged on the sheet.
That difference creates three things a buyer has to pin down before any split: the cutting file version, the sheet size the parts were nested on, and the density and hardness grade of the foam lot they came from. Change one of them between deliveries and you can get the same drawing with a part that fits differently in an assembly or packs differently in a carton.
Setup on a laser route is mostly preparation, not machine time. The work that has to be finished before cutting starts:
For planning purposes, split the timeline into three blocks and ask the factory to date each one separately in the order confirmation. The published figures on Fulikai's delivery and support page are a useful reference point: plate-making in 5–7 days, and bulk orders delivered within 15 days. Those numbers describe a single continuous run, so a split order needs them restated per batch.
| Block | Runs once or per delivery | What to confirm in writing |
|---|---|---|
| Plate-making / tooling | Once, if the plate and cutting file are stored | Storage period for the approved plate and the cutting file; cost if a remake is required |
| Cutting and nesting | Per delivery | Sheet format and parts-per-sheet used for the first batch, held for the second |
| Inspection and packing | Per delivery | Fulikai carries out 16 types of tests during production and a full manual inspection before shipment; confirm whether both deliveries follow the same checklist and whether third-party inspection is booked per batch or once |
Fulikai's custom workflow runs through consultation, proposal and quotation, design drafts and renderings, mould opening and print moulding, signature confirmation, and a 30% deposit on signing the contract. For a split order, add one attachment to that sequence: a single reference sheet listing the cutting file version, part dimensions, sheet format, foam grade and colour standard, with both delivery dates named against it. That sheet is what you compare the second delivery to when it arrives.
If your programme covers bath toys, traction pads, promotional flip-flops or mat components from a custom EVA foam manufacturing supplier, the same four lines — file version, nesting, material lot, plate storage — decide whether a split delivery matches the first batch or needs a fresh sample round.
Send your drawings and delivery plan
Fulikai is a Shenzhen EVA foam product factory with a plant of over 3,000 square metres covering foaming, cutting, stamping and laser processing. Share your drawing or sample together with the split quantities you are considering, and the service team will confirm which cutting route, plate cost and delivery dates apply to each batch.
Call or message +86 13827489472, email sales@fulikaisz.com.cn, or use the inquiry form.
Tel
+86 13827489472
+86 13827489472
sales@fulikaisz.com.cn
5th Floor, Building B, Yuanfen Industrial Zone, Dalang Street, Longhua District, Shenzhen, China